 |
1. Minimum 1/3 rd less cost to manufacture carriages and rail. |
 |
2. Faster than any other design with speeds up to 800 kph. |
 |
3. No moving parts. |
 |
4. Does not require bridges over water or creeks. |
 |
5. Perfect design for use in tunnels as the design is round and rails are inbuilt during tunnel manufacture. |
 |
6. No need for land excavation i.e. undulation. |
 |
7. Light weight plastics injection moulding of track and carriages materials used Kevlar and other new plastics. |
 |
8. Green Advantages: Wind Power electrifying the rail. Solar and onboard generators used to power the carriage magnets. |
 |
9. A flexible transportation solution for the public and private sector. |
 |
10. High speed automated transportation suitable for the freight and mining industries. |
|
|